A scheme consultation to be carried out with amended drawing following on from previous 2022 consultation carried out with an inaccurate scheme drawing. This is part of a wider package of measures advertised separately as part of the Braintree ATF2 Programme
Details
Decision Proposed
Station Approach, Braintree - Bus Only sign
A scheme consultation to be carried out with amended drawing following on from previous 2022 consultation carried out with an inaccurate scheme drawing. This is part of a wider package of measures advertised separately as part of the Braintree ATF2 Programme
Added to the Forward Plan: 20/06/23
A key decision needs to have been listed on the Forward Plan for at least 28 clear days before it is made.
28 day period expires 19/07/23, submission states decision likely to be taken by 27/10/23
Rolled over further month pending decision.
Decision dates are automatically rolled over to the next month except where specific dates have been provided for the decision to be taken.
Background Papers
Ben Fryer, Principal Transportation and Infrastructure Planner
To be submitted: CMA; ECIA; Consultation report; Scheme Drawings and Public Notice
Department Details
Highways, Infrastructure and Sustainable Transport
Decision Maker
Tom Cunningham - Cabinet Member for Highways Infrastructure and Sustainable
Highways, Infrastructure and Sustainable Transport
This section allows you to view the reports for the forward plan item.