To consider report DR/06/22 relating to the details pursuant to Condition 66 (Plan of action for an alternative use or a scheme of rehabilitation) of ESS/34/15/BTE. ESS/34/15/BTE was for "Variation of condition 2 (application drawings) of planning permission ESS/55/14/BTE to allow amended layout of Integrated Waste Management Facility. The Integrated Waste Management Facility comprising: Anaerobic Digestion Plant treating mixed organic waste, producing biogas converted to electricity through biogas generators; Materials Recovery Facility for mixed dry recyclable waste to recover materials e.g. paper, plastic, metals; Mechanical Biological Treatment facility for the treatment of residual municipal and residual commercial and industrial wastes to produce a solid recovered fuel; De-inking and Pulping Paper Recycling Facility to reclaim paper; Combined Heat and Power Plant (CHP) utilising solid recovered fuel to produce electricity, heat and steam; extraction of minerals to enable buildings to be partially sunken below ground level within the resulting void; visitor/education centre; extension to existing access road; provision of offices and vehicle parking; and associated engineering works and storage tanks. And approval of details required by condition (the details taking account of the proposed amended drawings), the conditions sought to be discharged are as follows: 6 (access road, cross over points), 13 (Signage, Telecommunications & Lighting at Woodhouse Farm complex), 14 (Stack design and finishes), 15 (design details and construction materials), 17 (management plan for the CHP), 18 (green roof), 20 (construction compounds, parking of vehicles), 22 (foul water management), 23 (surface water drainage and ground water management), 24 (groundwater monitoring), 37 (signs on access road at footpath crossings), 43 (lighting scheme during construction), 45 (phasing scheme for access road, retaining wall and mineral extraction), 50 (fencing - temporary and permanent), 53 (ecological survey update), 54 (Habitat Management Plan update), 57 (landscaping - bunding & planting), 59 (trees, shrubs and hedgerows - retention and protection), 60 (tree management and watering adjacent to retaining wall), 61 (Woodhouse Farm parking and landscaping), 62 (traffic calming measures at River Blackwater for otters and voles) and 63 (access road crossing points - lining and singing).
Location: Rivenhall Airfield, Coggeshall Road (A120), Braintree, CO5 9DF
Ref: ESS/34/15/BTE/66/01